ALBA Potline 6, Manama, Bahrain

  • Gebouwtype:
  • Energiesector
Volledig Scherm Sluiten

Peikko has delivered a substantial order of connection items to an expansion of an aluminium smelter plant located in Bahrain. The order comprises more than 10 000 pieces of HPKM® Column Shoes and HPM® Rebar Anchor Bolts for the plant’s column connections. The current Line 6 Expansion Project will make Aluminium Bahrain the largest single site aluminium smelter in the world.

“This project is one of the biggest industrial projects in Bahrain with a strong interest from the Bahraini government. We are honored that Peikko was chosen as a supplier for this significant plant investment. Decisive for this project was the fast and safe on-site assembly of Peikko’s column connections, which accelerates the frame erection phase. Also our effective software tools for the design of column connections were appreciated”, states Topi Paananen, CEO of Peikko Group Corporation.

Lees verder down-arrow.png

Projectinformatie

Projectontwikkelaar:
Aluminium Bahrain ALBA
Aannemer:
Nass Contracting
Ingenieursbureau:
Bechtel Corporation
Prefabbeton producent:
Nass Contracting / Delmon Precast
Geleverd:
2017
Opgeleverd:
2019

Toegepaste Peikko oplossingen

Contact

Cesar Molina

Cesar Molina

Project Manager

Saudi Arabia

[email protected]