City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Gebouwtype:
  • Kantoorgebouwen
Volledig Scherm Sluiten Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Lees verder down-arrow.png

Projectinformatie

Projectgrootte:
2100 m2
Verdiepingen:
2
Projectontwikkelaar:
CEF Ltd
Aannemer:
PCE Ltd
Ingenieursbureau:
Curtins
Architect:
FaulknerBrowns
Geleverd:
2016
Opgeleverd:
2017

Contact

Michael Scott

Michael Scott

Sales Manager, Deltabeam Products

England & Wales

Tel. +44 1325 318619
Mob. +44 755 7118470
[email protected]