EDGE ElbSide, Hamburg, Germany

  • Gebouwtype:
  • Overige publieke gebouwen
  • Kantoorgebouwen
  • Energiesector
  • Infrastructuur
Volledig Scherm Sluiten Street View

The EDGE ElbSide already shows one thing with its visual appearance: it certainly is not just another office building.

EDGE's now second project in the Elbbrückenquartier aims for maximum sustainability and will use renewable energy sources and photovoltaics. To minimize its own ecological footprint, the building will use smart building technology with a variety of efficient digital solutions.

Peikko Germany was able to present a convincing concept of the EDGE ElbSide project Hamburg meeting the requirements of a lightweight structure, coupled with a fast construction method. About 5,000 meters of the DELTABEAM® composite beam and about 2,000 anchor bolts and column shoes each are used for this purpose. The foundation will be reinforced with PSB® Punching Reinforcement. In addition, composite columns with high requirements for load bearing and steel components such as PCs® Corbels are used to speed up the construction progress in the long term.

The project is scheduled for completion in 2023.

Lees verder down-arrow.png

Projectinformatie

Projectgrootte:
23,930 m2
Projectontwikkelaar:
EDGE (OVG Real Estate)
Aannemer:
ARGE EDGE Elbside (ZECH Bau SE Niederlassung Hamburg)
Ingenieursbureau:
Assmann Beraten und Planen, Hamburg und Dortmund
Architect:
Behnisch Architekten
Prefabbeton producent:
DW Systembau
Geleverd:
2021 - 2022
Opgeleverd:
2023

Contact

Sascha Schaaf

Sascha Schaaf

Leitung Projektentwicklung

Tel. +49 6436 916464
Mob. +49 175 271 2173
[email protected]