Exterior Wall of Manufactory center IWC Schaffhausen, Schaffhausen, Switzerland

  • Gebouwtype:
  • Industriegebouwen
  • Kantoorgebouwen
Volledig Scherm Sluiten

Bolted connections for a noble logo wall

Peikko's bolted connections are ideally suited for wall panels in addition to the classic application for columns. The external wall of the IWC Schaffhausen manufacturing center serves as an example. The column shoes and anchor bolts were used as a connection for a prefabricated wall panel that has to withstand all weathers. It proved to be the simplest and most economical solution.

The simplest and best solution.

Alexandra Pieler, ATP architekten ingenieure Zürich AG

Projectinformatie

Aannemer:
Walo Bertschinger Central AG
Ingenieursbureau:
ATP architekten ingenieure Zürich AG
Architect:
ATP architekten ingenieure Zürich AG
Prefabbeton producent:
K. Studer AG
Geleverd:
2017
Opgeleverd:
2017

Toegepaste Peikko oplossingen

Contact