Four Seasons Staff Housing, Dubai, UAE

  • Gebouwtype:
  • Appartementen en woningen
Volledig Scherm Sluiten Street View

Built in the heart of an active industrial area of Dubai, the Four Seasons Staff Housing project is a distinguishable building among the surrounding environment. The design’s original time and cost estimates were met by using Peikko's DELTABEAM® solution. 

 Consisting of two parallel buildings with a central connection, the H-shaped structure stands out with floor-to-floor windows built within concrete blocks. The original design featured cast-in-place concrete columns and cast-in-place post-tensioned slabs with external concrete block walls.

The design consists of precast insulated cladding panels, internal precast frames and walls, and Hollow Core Slabs with the following key features:
• Continuous insulation with no thermal breaks
• Flat slabs at cantilevers and corridors
• Fast construction
• Reduced internal finishes

In 2014, the project received Honorable Mention under the Multifamily Housing category at the prestigious PCI Awards. 

www.econstruct.ae

Lees verder down-arrow.png

Projectinformatie

Projectgrootte:
21000 m2
Verdiepingen:
5
Projectontwikkelaar:
Bright Start LLC
Aannemer:
Dubai Contracting Company
Prefabbeton producent:
e.construct
Geleverd:
2014
Opgeleverd:
2014