Haldor Topsøe, Frederikssund, Denmark

  • Gebouwtype:
  • Industriegebouwen
Volledig Scherm Sluiten

Haldor Topsøe is a world leader in catalysis and surface science.

Haldor Topsøe A/S opened a large extension of the company's catalyst plant in Frederikssund, Denmark.

The concrete columns in the plant is fastened with Peikko PEC® column shoes and PPM® anchor bolts in the foundation that led to fast and effective erection of the structure.

The extension, represents an investment in excess of DKK 300 million, and consists of the addition of a new production unit called "P6", which will focus on the production of catalysts used by refineries worldwide to manufacture ultra-low sulfur diesel.

Lees verder down-arrow.png

Projectinformatie

Projectgrootte:
2500 m2
Aannemer:
Viuf A/S
Ingenieursbureau:
Morten Niemann - Rådg. Civiling. ApS
Prefabbeton producent:
Confac A/S
Geleverd:
2012
Opgeleverd:
2013