Logistics center Emma Kammacher Meirin, Switzerland

  • Gebouwtype:
  • Distributiegebouwen
Volledig Scherm Sluiten Street View

The strategic purchaser of Losinger-Marazzi SA, Mr. Thomas D'Halluin, searched a solution to erect high columns on single foundations without props, while maintaining a high level of site-safety.  Their application meant to install columns, free of props, without having to climb on a stair to fix propping or to unplug the crane's hook. Peikko Column Shoes ended up to be a used method in this project. This project revealed to be trendsetting.

We're happy having found a solution for this classic problem. We've heard many times, that columns should be preferably restraint with their foundations, but til now no commercial solution was available yet.

Bertrand Faucherre, Dr. Denis Clément

Projectinformatie

Projectgrootte:
20 000 m2
Verdiepingen:
3
Ingenieursbureau:
Thomas Jundt Ingénieurs Conseils SA Geneva
Prefabbeton producent:
Bétontec
Geleverd:
2010
Opgeleverd:
2011