RHKW waste burning plant, Linz-Mitte, Austria

  • Gebouwtype:
  • Energiesector
Volledig Scherm Sluiten

The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.

Projectinformatie

Projectontwikkelaar:
LINZ AG
Aannemer:
Bilfinger Berger BauGmbH, Linz
Ingenieursbureau:
BHM Ingenieure, Linz
Prefabbeton producent:
HABAU Hoch- und Tiefbau, Perg
Geleverd:
2010
Opgeleverd:
2011

Contact

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Mob. +43 664 381 74 05
[email protected]