Rusta's central warehouse, Norrköping, Sweden

  • Gebouwtype:
  • Distributiegebouwen
Volledig Scherm Sluiten

At the end of 2019, the expansion of Rusta's Central Warehouse phase four in Norrköping began. The new warehouse covers a total of 69,000 square meters, which is equivalent to approximately 10 soccer fields.

Rusta's central warehouse in Norrköping has expanded. The new building consists of 69,000 square meters. The expansion was started at the end of 2019 and was in operation during the fall of 2021. Prefabsystem Syd was the overall contractor for the expansion. The entire building is powered by geothermal energy and green electricity.

Peikko has supplied several models of HPM® Anchor Bolts with associated Anchor Bolt Installation Template to this project. The installation templates are designed to give the bolts an accurately position and be fixed into the molding with the PPL Anchor Bolt Installation Template.

Lees verder down-arrow.png

Projectinformatie

Projectgrootte:
69000 m² m2
Verdiepingen:
2
Projectontwikkelaar:
Rusta F4 Construction
Aannemer:
Prefabsystem Syd
Geleverd:
2020
Opgeleverd:
2021

Toegepaste Peikko oplossingen

Contact